- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- Western Europe, Swimming pool maintenance (2000 – present) Maintenance and repair on moveable floors in about 200 swimming pools a year. High-tech underwater work in warm […]
- SALVAGE OF BROKEN VIBROCORE PIPE Near the coast of Zeebrugge (B) and windfarm Rentel a broken vibrocore pipe had to be searched and salvaged. With our […]
- INSTALLATION OF A SINGLE-POINT MOORING (SPM) BUOY IN ROMANIA Early June 2008, the workship RAM departed to the Black Sea in Romania for a major job […]
- GROUT LINES 28.4 KM REMOVED ContractIn the middle of August 2013 DUC Marinegroup received a contract from RWE Innogy, for works on the offshore windfarm Nordsee […]
- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]