- INSPECT, TEST AND IF REQUIRED REPLACE ANODES Port of Rotterdam and Amsterdam, The Netherlands In the Port of Rotterdam and Amsterdam, DUC Marine Group regularly checks […]
- GROUT LINES 28.4 KM REMOVED ContractIn the middle of August 2013 DUC Marinegroup received a contract from RWE Innogy, for works on the offshore windfarm Nordsee […]
- VOPAK PILE ENCAPSULATION Port of Rotterdam, Nederland At Vopak in the port of Rotterdam, DUC Marinegroup blasted and preserved steel piles in a five-year project by […]
- Install a separation wall in the cooling tower basin In the basin of the cooling towers of a metal processing company, a dividing wall has been […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- SALVAGE OF A COAL BARGE In the Port of Amsterdam, an 85-metre long coal barge had perished to a depth of 14 metres. In cooperation with […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]