- Western Europe, Swimming pool maintenance (2000 – present) Maintenance and repair on moveable floors in about 200 swimming pools a year. High-tech underwater work in warm […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- INSPECT, TEST AND IF REQUIRED REPLACE ANODES Port of Rotterdam and Amsterdam, The Netherlands In the Port of Rotterdam and Amsterdam, DUC Marine Group regularly checks […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]
- REPLACING OIL PIPELINE In Ashkelon, DUC Marine Group helped with the replacement of two 1500-m sections of pipeline. These oil pipes ran from a refinery to […]
- SALVAGE OF THE FISHING VESSEL UK 249 Harbour Urk, The Netherlands Due to the freezing cold weather in February several vessels were damaged, amongst which the […]