- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- VOPAK PILE ENCAPSULATION Port of Rotterdam, Nederland At Vopak in the port of Rotterdam, DUC Marinegroup blasted and preserved steel piles in a five-year project by […]
- GROUT LINES 28.4 KM REMOVED ContractIn the middle of August 2013 DUC Marinegroup received a contract from RWE Innogy, for works on the offshore windfarm Nordsee […]
- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]
- ENECOGEN ROTTERDAM Power Plant, Rotterdam DUC Marinegroup in cooperation with BAM installed two cooling water inlets for a power plant in Rotterdam. This was completed to […]
- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- INSPECT, TEST AND IF REQUIRED REPLACE ANODES Port of Rotterdam and Amsterdam, The Netherlands In the Port of Rotterdam and Amsterdam, DUC Marine Group regularly checks […]
- REPLACING OIL PIPELINE In Ashkelon, DUC Marine Group helped with the replacement of two 1500-m sections of pipeline. These oil pipes ran from a refinery to […]
- M.E.T. Pile Encapsulation Port of Rotterdam, The Netherlands At the Maatschap Europoort Terminal (M.E.T.) in the 7th Petroleum harbour of Rotterdam, DUC Marinegroup together with Henskens B.V. […]