- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- WRECK REMOVAL EEMSGEUL PHASE 1 Before dredging could start for a new deep navigation channel to the busy Port of Eemshaven, in the far North of […]
- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]
- Western Europe, Swimming pool maintenance (2000 – present) Maintenance and repair on moveable floors in about 200 swimming pools a year. High-tech underwater work in warm […]
- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- SALVAGE OF BROKEN VIBROCORE PIPE Near the coast of Zeebrugge (B) and windfarm Rentel a broken vibrocore pipe had to be searched and salvaged. With our […]
- SALVAGE OF A COAL BARGE In the Port of Amsterdam, an 85-metre long coal barge had perished to a depth of 14 metres. In cooperation with […]
- CLEARANCE SEA-FLOOR OF SEVERAL ANCHORAGES The Dutch Ministry of Infrastructure and the Environment awarded DUC Diving a contract for cleaning the designated anchorages in front of […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]