- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- INSTALLATION BOATLANDING 30 km North of Helgoland, Germany. Because the distance of the fenders of several CTVs to the existing current sports of the boatlanding was […]
- WALL THICKNESS MEASUREMENTS IN GEORGIA Georgia, Europe At the end of 2011, DUC Marinegroup performed wall thickness measurements on a quay wall made of sheet piling […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- Install a separation wall in the cooling tower basin In the basin of the cooling towers of a metal processing company, a dividing wall has been […]
- CLEARANCE SEA-FLOOR OF SEVERAL ANCHORAGES The Dutch Ministry of Infrastructure and the Environment awarded DUC Diving a contract for cleaning the designated anchorages in front of […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]