- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- INSTALLATION BOATLANDING 30 km North of Helgoland, Germany. Because the distance of the fenders of several CTVs to the existing current sports of the boatlanding was […]
- SALVAGE OF BROKEN SPUDLEG Niger Delta, Africa The Jack-up barge “Lewek Leader” lost one of her three spud legs during works in the Nigerian Delta at […]
- SALVAGE OF BROKEN VIBROCORE PIPE Near the coast of Zeebrugge (B) and windfarm Rentel a broken vibrocore pipe had to be searched and salvaged. With our […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- INSTALLATION OF A SINGLE-POINT MOORING (SPM) BUOY IN ROMANIA Early June 2008, the workship RAM departed to the Black Sea in Romania for a major job […]
- REMOVAL OF GROUT BLOCKS FROM A DIAPHRAGM WALL IN FRANCE Le Havre, France During the construction of a new harbour in Le Havre (France), grout blocks […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]











