    Installation of a boatlanding

      INSTALLATION BOATLANDING

      30 km North of Helgoland, Germany. 

      Because the distance of the fenders of several CTVs to the existing current sports of the boatlanding was not sufficient, the Client asked DUC Marine Group to install two extension pieces. For this job DUC mobilised a big Multicat, a CTV, a RIB and a Rope Access Team. The ladders were loaded in the port of Delfzijl (Holland) and were prepared on deck for installation.

      Because of the lifting height and the movement of the vessel on the swell, DUC was careful not to damage the steel structures and decided to hoist the pipes with an electric hoist and a Rope Access Team. Due to the existing inter array and export cables anchoring was prohibited. Mooring with ropes to the jacket was also prohibited.

      To overcome this problem the extension pieces were gently lowered into the water with the Multicats Deckcrane and connected to a 5 ton lifting bag underwater. The lifting bag was then towed to the boat landing and hoisted into position. All bolts were tightened to the correct torque. In total 4 pieces were installed.

      Categories: Boat landing, Maintenance and Repairs, Offshore, Offshore Construction and Installation, Oil and Gas, Renewables, Wind Park, Rope Access

      Gerelateerd

      14/01/2016

      Clearance sea-floor of several anchorages


      Lees meer

      Den Helder, 28 augustus 2013Duiker is een wand aan dichtlassen zodat deze wand geen lekkage meer heeft.

      14/01/2016

      Inspect, testing and replacing of anodes


      Lees meer
      22/12/2015

      Grout lines removed


      Lees meer
      22/12/2015

      Burial of a cable loop


      Lees meer
      14/01/2016

      Replacing oil pipeline Israel


      Lees meer
      14/01/2016

      Vopak pile encapsulation


      Lees meer

      Projects

      • Boatlanding
      • Bridge
      • Cable burial
      • Cathodic Protection
      • Concreting
      • Construction Pit
      • Inshore
      • Inshore Salvage
      • Marine
      • Non Destructive Testing
      • Offshore
      • Offshore Salvage
      • Oil and Gas
      • Pipelines
      • Prereservation
      • Renewables
      • Rope accesss
      • Salvage
      • Wind park
      OUR ADDRESS

      DUC Marine Group

      Marsdiep 23
      8321MC Urk
      The Netherlands
      info@ducmarinegroup.com

      FOLLOW US

      Social Media

      Keep in contact with us on
      our social media channels


      TELEPHONE

      24 hour contact

      call us
      24/7 contact number
      +31 (0) 527 684 444

      All rights reserved - DUC Marine Group
        Contact
        English
        • Dutch
        • English
          • English
          • Nederlands (Dutch)