- WRECK REMOVAL EEMSGEUL PHASE 1 Before dredging could start for a new deep navigation channel to the busy Port of Eemshaven, in the far North of […]
- REPLACING OIL PIPELINE In Ashkelon, DUC Marine Group helped with the replacement of two 1500-m sections of pipeline. These oil pipes ran from a refinery to […]
- SALVAGE OF BROKEN SPUDLEG Niger Delta, Africa The Jack-up barge “Lewek Leader” lost one of her three spud legs during works in the Nigerian Delta at […]
- SALVAGE OF BROKEN VIBROCORE PIPE Near the coast of Zeebrugge (B) and windfarm Rentel a broken vibrocore pipe had to be searched and salvaged. With our […]
- VOPAK PILE ENCAPSULATION Port of Rotterdam, Nederland At Vopak in the port of Rotterdam, DUC Marinegroup blasted and preserved steel piles in a five-year project by […]
- INSTALLATION BOATLANDING 30 km North of Helgoland, Germany. Because the distance of the fenders of several CTVs to the existing current sports of the boatlanding was […]
- GROUT LINES 28.4 KM REMOVED ContractIn the middle of August 2013 DUC Marinegroup received a contract from RWE Innogy, for works on the offshore windfarm Nordsee […]
- CLEARANCE SEA-FLOOR OF SEVERAL ANCHORAGES The Dutch Ministry of Infrastructure and the Environment awarded DUC Diving a contract for cleaning the designated anchorages in front of […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]