- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- WRECK REMOVAL EEMSGEUL PHASE 1 Before dredging could start for a new deep navigation channel to the busy Port of Eemshaven, in the far North of […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- GROUT LINES 28.4 KM REMOVED ContractIn the middle of August 2013 DUC Marinegroup received a contract from RWE Innogy, for works on the offshore windfarm Nordsee […]
- WALL THICKNESS MEASUREMENTS IN GEORGIA Georgia, Europe At the end of 2011, DUC Marinegroup performed wall thickness measurements on a quay wall made of sheet piling […]
- INSTALLATION OF A SINGLE-POINT MOORING (SPM) BUOY IN ROMANIA Early June 2008, the workship RAM departed to the Black Sea in Romania for a major job […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]
- VOPAK PILE ENCAPSULATION Port of Rotterdam, Nederland At Vopak in the port of Rotterdam, DUC Marinegroup blasted and preserved steel piles in a five-year project by […]
- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]