- INSTALLATION OF A SINGLE-POINT MOORING (SPM) BUOY IN ROMANIA Early June 2008, the workship RAM departed to the Black Sea in Romania for a major job […]
- WRECK REMOVAL EEMSGEUL PHASE 1 Before dredging could start for a new deep navigation channel to the busy Port of Eemshaven, in the far North of […]
- SALVAGE OF THE FISHING VESSEL UK 249 Harbour Urk, The Netherlands Due to the freezing cold weather in February several vessels were damaged, amongst which the […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- SALVAGE OF A COAL BARGE In the Port of Amsterdam, an 85-metre long coal barge had perished to a depth of 14 metres. In cooperation with […]
- BURIAL OF A CABLE LOOP Windpark DanTysk, German Economic Zone. The DanTysk wind farm is located approx. 70 km west of the North Sea island of […]
- CLEARANCE SEA-FLOOR OF SEVERAL ANCHORAGES The Dutch Ministry of Infrastructure and the Environment awarded DUC Diving a contract for cleaning the designated anchorages in front of […]
- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]