- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- WALL THICKNESS MEASUREMENTS IN GEORGIA Georgia, Europe At the end of 2011, DUC Marinegroup performed wall thickness measurements on a quay wall made of sheet piling […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]
- Western Europe, Swimming pool maintenance (2000 – present) Maintenance and repair on moveable floors in about 200 swimming pools a year. High-tech underwater work in warm […]
- VOPAK PILE ENCAPSULATION Port of Rotterdam, Nederland At Vopak in the port of Rotterdam, DUC Marinegroup blasted and preserved steel piles in a five-year project by […]
- SALVAGE OF THE FISHING VESSEL UK 249 Harbour Urk, The Netherlands Due to the freezing cold weather in February several vessels were damaged, amongst which the […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- SALVAGE OF BROKEN VIBROCORE PIPE Near the coast of Zeebrugge (B) and windfarm Rentel a broken vibrocore pipe had to be searched and salvaged. With our […]











