- CLEARANCE SEA-FLOOR OF SEVERAL ANCHORAGES The Dutch Ministry of Infrastructure and the Environment awarded DUC Diving a contract for cleaning the designated anchorages in front of […]
- REPLACING OIL PIPELINE In Ashkelon, DUC Marine Group helped with the replacement of two 1500-m sections of pipeline. These oil pipes ran from a refinery to […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- M.E.T. Pile Encapsulation Port of Rotterdam, The Netherlands At the Maatschap Europoort Terminal (M.E.T.) in the 7th Petroleum harbour of Rotterdam, DUC Marinegroup together with Henskens B.V. […]
- SALVAGE OF LOST SUSPENSION BRIDGE PARTS IJmuiden Approach Channel, Netherlands The outbound vessel “Wilson Leer” lost her deck cargo of steel modules for a suspension bridge, […]
- MAKING A CONDENSER PIT WATERTIGHT Tunisia, Middle East In 2004 in Tunisia, DUC Marinegroup used shotcrete injection to repair and apply a watertight layer to a […]
- WRECK REMOVAL EEMSGEUL PHASE 1 Before dredging could start for a new deep navigation channel to the busy Port of Eemshaven, in the far North of […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]