- SALVAGE OF A COAL BARGE In the Port of Amsterdam, an 85-metre long coal barge had perished to a depth of 14 metres. In cooperation with […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- Install a separation wall in the cooling tower basin In the basin of the cooling towers of a metal processing company, a dividing wall has been […]
- ENECOGEN ROTTERDAM Power Plant, Rotterdam DUC Marinegroup in cooperation with BAM installed two cooling water inlets for a power plant in Rotterdam. This was completed to […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- WALL THICKNESS MEASUREMENTS IN GEORGIA Georgia, Europe At the end of 2011, DUC Marinegroup performed wall thickness measurements on a quay wall made of sheet piling […]
- Western Europe, Swimming pool maintenance (2000 – present) Maintenance and repair on moveable floors in about 200 swimming pools a year. High-tech underwater work in warm […]