- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- Install a separation wall in the cooling tower basin In the basin of the cooling towers of a metal processing company, a dividing wall has been […]
- INSPECT, TEST AND IF REQUIRED REPLACE ANODES Port of Rotterdam and Amsterdam, The Netherlands In the Port of Rotterdam and Amsterdam, DUC Marine Group regularly checks […]
- AQUATIC CENTRE LONDON (GB) London, UK For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 […]
- REMOVAL OF GROUT BLOCKS FROM A DIAPHRAGM WALL IN FRANCE Le Havre, France During the construction of a new harbour in Le Havre (France), grout blocks […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]