- MAURITANIAN IRON ORE JETTY Mauritania, Africa During a five-year project, DUC Marinegroup performed maintenance to an iron ore jetty in Mauritania, Africa. The jetty was protected […]
- SALVAGE DRY DOCK In Sluiskil, DUC Marinegroup was contracted to salvage the sunken Dry Dock B of the Schroef shipyard. After being awarded this contract, DUC […]
- SHELL PARKING GARAGE The head office of SHELL is located right in the heart of The Hague. This area having little or no parking facilities, a […]
- WRECK REMOVAL CONTAINERCRANEPHASE 1 During a short sea trip from the Amsterdam container terminal Ceres to Rotterdam’s container terminal Uniport, a container crane toppled off a […]
- WALL THICKNESS MEASUREMENTS IN GEORGIA Georgia, Europe At the end of 2011, DUC Marinegroup performed wall thickness measurements on a quay wall made of sheet piling […]
- Install a separation wall in the cooling tower basin In the basin of the cooling towers of a metal processing company, a dividing wall has been […]
- CONSTRUCTION PARKING GARAGE MAHLER 4 For the construction parking garage mahler 4 in busy Amsterdam. we carried out underwater concreting at a depth of six metres. […]
- SALVAGE OF A COAL BARGE In the Port of Amsterdam, an 85-metre long coal barge had perished to a depth of 14 metres. In cooperation with […]










