AQUATIC CENTRE LONDON (GB)
London, UK
For the construction of the Olympic Swimming Pool in London, DUC assisted with the installation of four movable floors, 2 booms and 1 submersible boom. With our assistance the pool was ready in time for the Olympics in 2012.
Categories: Civil Underwater Construction, Inshore, Swimming Pool Construction